2021-02-26 · 2 min read · Oakland
Oakland Sewer Lateral Compliance: What Sellers and Buyers Need to Know
Selling a house in Oakland and the surrounding cities comes with a few local requirements you won't find everywhere, and sewer lateral compliance is one of the biggest.
Hi, I'm Tanja Odzak, Realtor with eXp Realty, working Oakland and the greater East Bay.
A private sewer lateral is the pipe that carries wastewater from a house to the main sewer line running under the street. A lot of East Bay homes were built before 1950 and still have their original clay pipes, which crack, shift, or get invaded by tree roots over time. When that happens, rainwater and groundwater seep in, overwhelming the sewer system and treatment plants, which can send untreated wastewater into the Bay.
To address this, EBMUD (East Bay Municipal Utility District), along with about 20 East Bay cities and one sewer district, phased in the Private Sewer Lateral (PSL) ordinance starting in 2011. If your property is in Alameda, Albany, Emeryville, Oakland, Piedmont, Kensington, El Cerrito, Richmond Annex, or select Contra Costa cities (Berkeley runs its own separate program), you'll need an EBMUD certificate confirming your lateral is leak-free.
Compliance gets triggered by one of three things: buying or selling the property, building or remodeling over $100,000, or changing your water meter size, or you can bring it into compliance voluntarily anytime. A licensed inspector runs a camera down the pipe to check for cracks, offset joints, or root intrusion. If it fails, repairs or replacement are required, followed by a verification test witnessed by EBMUD before you get your certificate. Costs typically start around $5,000 and can run higher depending on the extent of the work.
I'm Tanja Odzak, and I've sold over $100 million worth of homes with a decade of experience in the East Bay. As a seller, knowing whether your property is in a compliance zone, and budgeting or negotiating accordingly, needs to happen early. As a buyer, the same questions apply, and if the lateral isn't compliant at closing, new owners can put down a $4,500 deposit with EBMUD and file for a 180-day extension. Let's talk through what this means for your specific property.